Smart Factory Plan (more details)



  • The original layout of the XXX company had a lot of storage areas, the material storage area was far away from the point of use, there are a lot of cross logistics routes.
    The assembly line length was shortened from 169m to 72m by SKD assembly and new technology. According to the layout of the module, logistics distribution distance was shortened by 45%.